4 Way Rv Production Line
This is a private page introducing the 4 way rv production line
Briefly introduce our production steps, the raw materials are generally copper tubes.
I will keep updating
- The first step is to cut these 4 tubes to the required size
- Manufactured into desired shape
- Brazing
- Cleaning
- Testing
Introduction To Basic Knowledge
The first paragraph introduces the tube system and process of 4 way rv
4 way rv is shown in the picture, with 4 external tubes.
We call them S tube, EC tube, D tube.

S tube

EC tube

D tube

Tube Plan 1
This is a solution with a lower level of integration than Plan 2. It requires a large number of machines, but the cost will be lower. The connection between steps can be done by manipulators or manually.

Tube Cutting
All tubes(S,D,EC) can be cut to required length first by cutting machine.
Oil/gas pressure : 0mpa/0.5-0.8mpa
Size:15*1.6*1.8m
Power rating:6.5kw
S Tube End Forming
S Tube End Forming
Oil/gas pressure : 0-3.5mpa/0.5-0.8mpa
Size:1.72*1.83*1.65m
Power rating:6.5kw
EC Tube End Forming
EC Tube End Forming
Oil/gas pressure : 3-7 mpa/0.5-0.8mpa
Size:2.1*1.2*1.8m
Power rating:8kw
D Tube End Forming
D Tube End Forming
Oil/gas pressure : 0-7 mpa/0.5-0.8mpa
Size:2.8*1.8*1.1m
Power rating:7.5kw
Tube Plan 2
This solution integrates several steps as much as possible, which is faster and reduces the handling of parts, but the cost will be higher.

EC/S /D Tube End Forming And Punching
EC/S /D Tube These three tubes have a direct-from-raw solution, including punched holes
Oil/gas pressure : 2-12 mpa/0.5-0.8mpa
Size:18*2.2*2.2m
Power rating:13kw
Brazing
Brazing is the welding of all parts together.

Tube Cutting
Oil/gas pressure : 0mpa/0.4-0.6mpa
Size:1.8*1.85*2.5m
Power rating:2kw
Cleaning
Brazed valves need to be cleaned before testing

Máquina pulidora magnética
In order to protect the capillary, the polishing groove will be designed as a rectangle, I don’t have the video footage of the rectangle, it is a circle in the video.
Size:1.7*0.7*0.6m
Power rating:12.5kw
Testing
The last step is testing.
There is no video for this, but the principle is very simple, by injecting air into the 4 way rv, then submerging it into the water, and observing whether there is air leakage through the barometer and visual inspection.

4 Way Rv Production Line Buying Guide
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.